<p id="f9hjj"></p>
    <output id="f9hjj"><cite id="f9hjj"></cite></output>
          <pre id="f9hjj"></pre>
        <p id="f9hjj"></p>

        <output id="f9hjj"><del id="f9hjj"><dfn id="f9hjj"></dfn></del></output><pre id="f9hjj"></pre>
        <p id="f9hjj"></p>

        <p id="f9hjj"></p>
        <del id="f9hjj"><b id="f9hjj"><var id="f9hjj"></var></b></del>

        <pre id="f9hjj"><del id="f9hjj"><mark id="f9hjj"></mark></del></pre><del id="f9hjj"><del id="f9hjj"><thead id="f9hjj"></thead></del></del>

        NEWS

        HOME/ NEWS

        NEWS

        Installation and maintenance of ball
          Published Time2013-11-29
        First, confirm that the ball valve is installed in front of the preparatory work
        1, to ensure the position of the ball valve installed in a coaxial position on the pipeline , the pipeline should be kept parallel to the two flanges , confirmed the pipeline can withstand the weight of the ball itself , if the ball found the pipeline can not bear weight, before installation of the pipeline with the appropriate support.
        2 , to confirm whether there are impurities , welding slag inside the pipeline , the pipeline should be purged .
        3 , check the ball nameplate, fully closed and fully open ball valve operation several times to confirm the valve to work properly, once again a comprehensive examination of all the details of the valve , ensure that the valve intact.
        4 , removal of the protective cover at both ends of the valve , check valve body is clean , cleaning the body cavity , the sealing surface of the ball valve is a ball shape , even small debris may also cause damage to the seal faces.
        Second, the ball valve installation
        1 , the ball valve can be installed in any section of the upstream end of the handle ball valve can be installed in any location pipeline , if configured actuators - Ball ( such as gear boxes , electric pneumatic actuator ) , you must be mounted vertically , the valve inlet and outlet in a horizontal position .
        2 , between the ball valve flange and pipe flange design by piping installed gasket .
        3 , the flange bolts need symmetry , successive , evenly tighten.
        4 , if the ball taken pneumatic and electric actuators , etc. , according to the instructions to complete the gas supply, the power supply installation.
        Third, check the ball after installation
        1 , after the installation is complete , start the ball valve opening and closing several times , should be flexible action , even by force , valve is working properly.
        2, according to the design requirements of the pipeline pressure , the pressure is detected through ball combination with the pipe flange sealing surfaces .
        Fourth, the ball valve repair
        1, only removable pressure ball valves before and after the demolition ball to the decomposition of the operation .
        2 , the ball valve assembly further decomposition and the need to have the protective sealing parts , in particular non-metallic parts , such as the O -ring member preferably using dedicated tools.
        3 , when the ball valve mounting bolts must be re- symmetry , and gradually , evenly tightened.
        4 , the cleaning agent should be compatible with the ball in the rubber parts, plastic parts, metal parts and the working medium ( such as gas ) and others . Working medium for the gas used gasoline (GB484-89) to clean metal parts. Non-metallic parts cleaning with pure water or alcohol.
        5 , decomposition down individual parts can be cleaned immersion methods . Impregnation still left down decomposition of non-metallic parts of the metal parts can be dry -cleaning rotor pump has a fine net of silk cleaning agent (to avoid shedding fibers adhere to the parts ) scrub. Must remove all the adhesive on the wall of grease, dirt, rubber , dust cleaning .
        6 , non-metallic parts after cleaning should be immediately removed from the cleaning agent , not a long soak.
        7 , after cleaning the wall needed to be washed after volatile cleaning agent ( not available cleaning agents silk soaked wipe ) for assembly, but not for a long time on hold , otherwise it will rust , contaminated dust.
        8, the new parts before assembly also need to be cleaned .
        9 , using grease lubrication. Grease should be compatible with the ball are metal, rubber parts, plastic parts and the working medium . Working medium for the gas , can be used such as 221 special grease . Coated on the surface of the seal member mounting groove of a thin layer of grease , a thin layer of grease applied to the rubber seal , valve stem seal surface and the friction surfaces coated with a thin layer of grease.
        10 , the assembly should not allow metal debris , fibers, oils ( other than the requirement to use ) dust and other impurities , foreign matter contamination , or remain on the adhesive surface of the part or into the lumen .

         

        亚洲视频免费天堂_亚洲欧美日韩久久精品_国产AⅤ精品一区二区三区久久_六月丁香婷婷色狠狠久久蜜桃

        <p id="f9hjj"></p>
          <output id="f9hjj"><cite id="f9hjj"></cite></output>
                <pre id="f9hjj"></pre>
              <p id="f9hjj"></p>

              <output id="f9hjj"><del id="f9hjj"><dfn id="f9hjj"></dfn></del></output><pre id="f9hjj"></pre>
              <p id="f9hjj"></p>

              <p id="f9hjj"></p>
              <del id="f9hjj"><b id="f9hjj"><var id="f9hjj"></var></b></del>

              <pre id="f9hjj"><del id="f9hjj"><mark id="f9hjj"></mark></del></pre><del id="f9hjj"><del id="f9hjj"><thead id="f9hjj"></thead></del></del>